Clicking on the thumbnail photos will open a much larger copy of that photo.
I am very pleased at the appearance of the cams. They show no chipping, scoring, or other signs of stress. The exhaust valve clearances should be slightly higher than the intake valve clearances.
A detailed examination shows the tolerances to be good. On the chart, some of the tolerances look "too tight" by half a thousanth of an inch. I am not going to replace a shim which is only half a thousanth of an inch out of range.
The valve covers need a little cosmetic refreshing as well. I ran these through the same process as the other covers, although I added "washing in the dishwasher" to get the crevices perfectly clean before spraying on the clearcoat paint.
This multipart piece seems to do many tasks!! It has passages for coolant, sections for crankcase ventilation, and piping for high pressure oil to the cylinders. I will be happy to install this part and forget about it. I really hope it does not get an oil mist on it like it did over the last 100,000km
This is the starter motor. If you remove the two long bolts, the motor comes apart for maintenance. The brushes are in excellent shape. This starter motor needed just a little cleaning up inside and out, and that's all.
The multipart piece is installed. The cam covers are being installed. The cam covers get new gaskets, and new "seals" around each of the bolts. These seals have never been previously replaced which is perhaps why they misted oil onto the cam cover. This task could normally be done with the engine "in" the frame, although it is vastly easier to accomplish with the engine "out"
The engine is ready to install!!
I continued by actually finally installing the engine back into the bike.